ARC Ground Care

Project Info

During the Summer period of 2018, we installed primary drainage for Walsall Abortetum’s events field. This included digging trenches, which we then back filled with gravel and rootzone. In addition to this, we installed man holes and shock-waved the field.

 

 

Client
Walsall Aboretum
Year
2018
We Did
Installed drainage at Walsall Aboretum.